| |

Dongying Hongtu Engineering Design Firm was established in March 2004 with registered capital of 500,000 yuan under Shandong Xinlue Group. It is a professional company for power supply, transforming engineering design, grid planning, feasibility study and related technical consultancy.
The company has always adhered to the guideline of “quality first, designing exquisitely, quality service, and customers’ satisfaction,” and targeted at offering engineering survey, design and services which adopt reasonable, safe and economic techniques and can meet customers’ demand, and promoting technological progress under state laws and regulations, national economic construction principles and policies. After several years of development, it has grown into a design consulting firm with considerable competitive strength, strong technical force, a complete range of specialties and advanced equipment.
Staff members with excellent educational background Currently it employs 30 people, including three senior engineers, 15 intermediate engineers, and 12 junior assistant engineers. The leading forces of its survey and design work (senior engineers and engineers) have a solid foundation of professional and technical knowledge and many years experience in power engineering survey and design. Other general professional and technical personnel all either have a college diploma or a degree. They also have been working in the area of power engineering survey and design for many years and can conduct survey and design independently.
Well equipped with design devices It is provided with 31 computers, one graphic plotter, nine printers, one blueprint machine, two copying machines, one electronic total station, one theodolite, one level, global positioning GPS and other devices.
Since its establishment, it has undertaken more than 30 projects of substation and power supply design as listed in the following. Eight 110 KV substation projects, including Xishui Station, Wangxi Station, Yonghua Station and so on; three 110 KV modification projects, including Duanhe Station, Yongtai Station and others; six 35 KV substation projects, including the Aoya Station, Huayu Station and others; 12 35 KV modification projects, including Shicun Station, Chunlei Station and others; a dozen of 110 KV line construction projects, including Lewang Line, Wangguang Line, Zhenghe Line and others; about twenty 110 KV line modification projects, including Heyong Line, Xinguang Line and Yangchen Line and others; over twenty 35 KV line construction projects, including Lezhang Line, Lejin Line, Lefeng Line and others; over thirty 35 KV line modification projects, including Yangjiang Line, Shihua Line, Hefeng Line and others. All these projects have passed appraisal of upper government units and been recognized by widespread clients.
With the continuous development of the electric power market, the company has gradually introduced modern enterprise management ideas to cultivate its employees and has established a set of strict internal management and competition mechanism. Moreover, it constantly improves its modern enterprise system and actively promotes innovation in the mechanism, management, administration, science and technology. Thus, great progress has been made in all aspects and significant social and economic benefits have been acquired. It has built a computer network and makes all of its designs through computers. In addition, it adopts professional application software for “transforming” and “transmission line.” The computer drawing rate reaches 100 percent. And the efficiency of survey and design work has been improved greatly. The company will continue to rely on science and technology advancement to further deepen corporate reform. Centered on technology and regarding quality as its life and customers as gods, the company is eager to provide satisfactory, safe and economic power transmission project design for customers.
|
|